In VYAPARI DEAL we start with the dream of a house of our client after knowing his overall requirement,choices and budget and turn it into reality step by step.

STEP 1- FLOOR PLAN AND ELEVATION –

According to the needs of client floor plan is made and elevation is designed by our experienced architects.

STEP 2 - SITE PREPARATIONS -

The start of house construction begins with the preparation and clearing of the site. Once the site is clear, levelled and ready you and the builder will stake out the floor plan on site.

STEP 3 - FOUNDATION AND PLINTH -

Foundations will be dug, caged and poured as per your structural engineers specifications and any "in slab" plumbing will be laid out.

STEP 4 - FRAMING –WALLS AND ROOF STRUCTURE -

After the slab is cured work will begin on the main structure of the house, this is one of the most exciting stages of house building. There are many different methods of construction available and this stage will vary slightly depending on your particular method of house construction: brick, concrete, steel etc. However the basic principle for this stage is the same - you will see the walls of your house rise from the slab and appear for the first time in front of your eyes.

STEP 5 - ROOFING -

Once the construction of the walls and roof structure is complete the roof will be installed and made waterproof.

STEP 6 – INTERNAL FINISHES AND CARPENTRY + FIXTURES ,FITTINGS AND EQUIPMENTS -

This stage will include plastering, painting, tiling and the installation of finished floors. Carpenters will work on the installation of any built in furniture such as kitchen cabinets and bedroom closets. Fixtures, Fittings and Equipment (FF&E as it's known in the trade) is the last major stage of house construction. Your electrician will come back and install your chosen lights, switches and power outlets and make the system live. Your plumber will return and install any faucets, sinks, toilets, showers and other wet systems.

STEP 7 – EXTERNAL FINISHES –

Depending on your type of house construction method, the exterior walls will now be finished. If your house has a solid wall construction such as block, brick or concrete this will typically involve rendering and painting the external walls and installation of windows will be done.

STEP 8 - Rough Ins-

Electricians and plumbers will install the required electrical cables and pipes. This stage of house construction is known as "roughing in" as they wont connect the cables or pipes to live sources until later in the construction process.

STEP 9- FINAL FINISHING AND OVERVIEW BY EXPERTS -

Its time for final finishing of house and to be reviewed by experts. You will tour the property with the builder and make a final inspection to ensure everything has been built as agreed and the builder has completed work as agreed in the construction contract. This is your final chance to discuss any issues and have them addressed by the builder.

STEP 10 – HANDOVER -

This is the moment you have been waiting for! It will seem like a long time since the start of house construction. The builder will hand you the keys to your new home after addressing the issues you raised during the "practical completion" tour.

At last we strongly believe in customer satisfaction in VYAPARIDEAL and provide post construction services too , for 3 months after the completion of project in case of any issue.